During a Post-Occupancy Evaluation (POE), what should the design team evaluate in addition to the project itself?
Specifications and detailing methods
Construction documentation procedures
All of these should be evaluated during a POE
Fee allotment
The correct answer is: All of these should be evaluated during a POE
In a Post-Occupancy Evaluation (POE), it is essential for the design team to assess not only the completed project but also various additional aspects that contribute to the overall success and effectiveness of the design. This includes evaluating specifications and detailing methods used throughout the design process, as they directly influence the quality and functionality of the project. Analyzing construction documentation procedures is also critical because these procedures impact how well the project was executed and can provide insight into potential areas for improvement in future projects. Additionally, examining fee allotment ensures that the budget was managed appropriately and highlights any financial discrepancies or efficiencies that could be addressed in future endeavors. Since all these components—specifications and detailing methods, construction documentation procedures, and fee allotment—play a vital role in the performance and evaluation of a design project, it is important to assess them collectively during a POE. This comprehensive approach allows for a better understanding of the project’s successes and shortcomings, ultimately leading to improvements in future design practices.